The QE Double Trolley Overhead Crane is a heavy-duty lifting solution designed for handling long, bulky, or exceptionally heavy loads requiring two lifting points. Equipped with two trolleys that operate independently or simultaneously, this crane enhances flexibility and efficiency in industrial settings. Below is a detailed overview of its features, specifications, and applications:
Dual Trolley System:
Independent or synchronized operation: Allows simultaneous lifting of two loads or balancing of long materials (e.g., pipes, steel bars, logs).
Equal capacity trolleys: Each trolley typically has the same lifting capacity, ranging from (2.5+2.5) tons to (200+200) tons
Double Girder Design:
Robust construction: Welded box girders made of high-quality steel (Q235B/Q345B) ensure stability and durability
Span flexibility: Adjustable spans from 10.5 to 35.5 meters (extendable to 50 meters for custom designs).
Safety and Control:
Safety mechanisms: Overload protection, emergency stops, limit switches, and anti-collision systems.
Control options: Cabin, pendant, or remote control for operational flexibility.
Customization:
Configurable lifting heights, speeds, and ambient temperature ranges (e.g., -25°C to +40°C).
Parameter | Range/Details |
---|---|
Lifting Capacity | (2.5+2.5)t to (200+200)t (total 5–400t) |
Span | 10.5–35.5m (customizable up to 50m) |
Lifting Speed | 3–11.5 m/min (hoist); 5–40.1 m/min (trolley) |
Crane Travel Speed | 40–110 m/min |
Work Duty Class | A5–A7 (ISO 4301-1) |
Ambient Temperature | -25°C to +40°C |
Power Supply | 380V, 50Hz, 3-phase |
Steel Mills & Foundries: Handling steel coils, pipes, and long metal bars.
Warehouses & Stockyards: Efficient stacking/retrieval of logs, paper rolls, and construction materials.
Ports & Shipyards: Loading/unloading long cargo (e.g., timber, pipes).
Manufacturing Facilities: Assembly of large machinery or structural components.
Operational Flexibility:
Dual trolleys enable handling of oversized or irregularly shaped loads.
Cost Efficiency:
Reduces labor and time by eliminating the need for multiple cranes.
High Stability:
Double girder structure and separate drive mechanisms ensure smooth operation under heavy loads.
Safety Compliance:
Complies with FEM, DIN, and ISO standards for reliability in harsh environments.
Feature | Double Trolley Crane | Single Trolley Crane |
---|---|---|
Load Handling | Dual-point lifting for long/heavy loads | Single-point lifting for standard loads |
Capacity | Up to 400t | Typically ≤200t |
Cost | Higher initial investment | Lower cost for basic tasks |
Use Case | Steel mills, ports, heavy logistics | General workshops, warehouses |
Selection suggestion
Load and span matching: the main beam structure should be selected according to the span of the plant (box beam is suitable for large span, and the cost of truss beam is lower);
Control mode priority: PLC+ wireless remote control is recommended for frequent collaborative work scenarios.
Easy maintenance: The modular design enables quick replacement of parts, and the maintenance-free wheels (polyurethane rims) reduce downtime.
For further technical details of the specific model (such as explosion-proof certification process or customized functions), please provide the specific parameters of the application scenario (such as ambient temperature, daily use frequency, etc.).
Yes, because the working condition are different, all our products are customized depending on detail requirement! So all your products will be specially designed by our engineers according to your workshop conditions.
Yes, all kinds of certification are available, if you have doubt, you can come to our factory and test it by yourself,or you can let some third-partied to do the inspection for you.
Yes, we have. But we only have the standard-sized products, if you need customized products, then it will take some time to manufacture it.
It depends on your products quantity and products data you given, but we will try our best to deliver your products as soon as possible.
We will sent you the detail installation manual or if you are needing, our installation engineers can come to your workshop to guide the installation.
You can come to our factory anytime when you are convenient. We will make arrangement to pick you up.